Seismic Network Operations
IU CASY
Casey, Antarctica
IU CASY commences operations on: 1996,050
| Host: | Geoscience Australia |
|---|---|
| Latitude: | -66.279 |
| Longitude: | 110.535 |
| Elevation: | 10 |
| Datalogger: | Q330 |
| Broadband: | STS-1VBB_w/E300 |
| Accelerometer: | FBA_ES-T_EpiSensor_Accelerometer |
| Telemetry Status at the NEIC: |
|
Vault Condition: The vault is a concrete structure in rock 6 meters below the surface. The pier is not isolated.
| Location Code | Channel Code | Instrument | Flags | Sample Rate | Dip | Azimuth | Depth |
|---|---|---|---|---|---|---|---|
| 00 | VMZ | STS-1VBB w/E300 | CH | 0.10 | 0.00 | 0.00 | 5.00 |
| 00 | VM2 | STS-1VBB w/E300 | CH | 0.10 | 0.00 | 0.00 | 5.00 |
| 00 | VM1 | STS-1VBB w/E300 | CH | 0.10 | 0.00 | 0.00 | 5.00 |
| 00 | VHZ | STS-1VBB w/E300 | CG | 0.10 | -90.00 | 0.00 | 5.00 |
| 00 | VH2 | STS-1VBB w/E300 | CG | 0.10 | 0.00 | 90.00 | 5.00 |
| 00 | VH1 | STS-1VBB w/E300 | CG | 0.10 | 0.00 | 0.00 | 5.00 |
| 00 | LHZ | STS-1VBB w/E300 | CG | 1.00 | -90.00 | 0.00 | 5.00 |
| 00 | LH2 | STS-1VBB w/E300 | CG | 1.00 | 0.00 | 90.00 | 5.00 |
| 00 | LH1 | STS-1VBB w/E300 | CG | 1.00 | 0.00 | 0.00 | 5.00 |
| 00 | BHZ | STS-1VBB w/E300 | CG | 20.00 | -90.00 | 0.00 | 5.00 |
| 00 | BH2 | STS-1VBB w/E300 | CG | 20.00 | 0.00 | 90.00 | 5.00 |
| 00 | BH1 | STS-1VBB w/E300 | CG | 20.00 | 0.00 | 0.00 | 5.00 |
| 10 | VMW | STS-2/VBB | CH | 0.10 | 0.00 | 0.00 | 5.00 |
| 10 | VMV | STS-2/VBB | CH | 0.10 | 0.00 | 0.00 | 5.00 |
| 10 | VMU | STS-2/VBB | CH | 0.10 | 0.00 | 0.00 | 5.00 |
| 10 | VHZ | STS-2 Standard-gain | CG | 0.10 | -90.00 | 0.00 | 5.00 |
| 10 | VH2 | STS-2 Standard-gain | CG | 0.10 | 0.00 | 90.00 | 5.00 |
| 10 | VH1 | STS-2 Standard-gain | CG | 0.10 | 0.00 | 0.00 | 5.00 |
| 10 | LHZ | STS-2 Standard-gain | CG | 1.00 | -90.00 | 0.00 | 5.00 |
| 10 | LH2 | STS-2 Standard-gain | CG | 1.00 | 0.00 | 90.00 | 5.00 |
| 10 | LH1 | STS-2 Standard-gain | CG | 1.00 | 0.00 | 0.00 | 5.00 |
| 10 | HHZ | STS-2 Standard-gain | TG | 100.00 | -90.00 | 0.00 | 5.00 |
| 10 | HH2 | STS-2 Standard-gain | TG | 100.00 | 0.00 | 90.00 | 5.00 |
| 10 | HH1 | STS-2 Standard-gain | TG | 100.00 | 0.00 | 0.00 | 5.00 |
| 10 | BHZ | STS-2 Standard-gain | CG | 40.00 | -90.00 | 0.00 | 5.00 |
| 10 | BH2 | STS-2 Standard-gain | CG | 40.00 | 0.00 | 90.00 | 5.00 |
| 10 | BH1 | STS-2 Standard-gain | CG | 40.00 | 0.00 | 0.00 | 5.00 |
| 20 | LNZ | FBA ES-T EpiSensor Accelerometer | CG | 1.00 | -90.00 | 0.00 | 5.00 |
| 20 | LN2 | FBA ES-T EpiSensor Accelerometer | CG | 1.00 | 0.00 | 90.00 | 5.00 |
| 20 | LN1 | FBA ES-T EpiSensor Accelerometer | CG | 1.00 | 0.00 | 0.00 | 5.00 |
| 20 | HNZ | FBA ES-T EpiSensor Accelerometer | TG | 100.00 | -90.00 | 0.00 | 5.00 |
| 20 | HN2 | FBA ES-T EpiSensor Accelerometer | TG | 100.00 | 0.00 | 90.00 | 5.00 |
| 20 | HN1 | FBA ES-T EpiSensor Accelerometer | TG | 100.00 | 0.00 | 0.00 | 5.00 |
| 30 | LDO | CI/PAS pressure sensor | CW | 1.00 | 0.00 | 0.00 | 5.00 |
PDF, All

PDF, Last Month

PDF, Last Year

PDF, Month

PDF, Current Week

PDF, Year


PDF, Last Month

PDF, Last Year

PDF, Month

PDF, Current Week

PDF, Year

Heliplot


Latency


Availability, Year

Availability, Since 1972

Availability, 2 Month


Availability, Since 1972

Availability, 2 Month

-
Current IssuesThe LNZ component is noisy.
-
2012-01-31Power restored and station upgraded to Q330 digitizer. STS-1 components rebuilt fixing persistent lowered response at long periods which had been present since a major flood in 1998.
-
2012-01-03The power cable to the station was severed.

