Seismic Network Operations

CU ANWB

Willy Bob, Antigua and Barbuda

CU ANWB commences operations on: 2007,250

Country Flag
Host: National Office of Disaster Services
Latitude: 17.669
Longitude: -61.786
Elevation: 39
Datalogger: Q330
Broadband: STS-2
Accelerometer: FBA
Telemetry Status at the NEIC: Last Data In Less Than 10 Minutes
Station Photo Station Photo Station Photo 
Location CodeChannel CodeInstrumentFlagsSample RateDipAzimuthDepth
00BH1Streckeisen STS-2 Standard-gainCG40.000.000.000.00
00BH2Streckeisen STS-2 Standard-gainCG40.000.0090.000.00
00BHZStreckeisen STS-2 Standard-gainCG40.00-90.000.000.00
00LH1Streckeisen STS-2 Standard-gainCG1.000.000.000.00
00LH2Streckeisen STS-2 Standard-gainCG1.000.0090.000.00
00LHZStreckeisen STS-2 Standard-gainCG1.00-90.000.000.00
00VMUStreckeisen STS-2 Standard-gainCH0.100.000.000.00
00VMVStreckeisen STS-2 Standard-gainCH0.100.000.000.00
00VMWStreckeisen STS-2 Standard-gainCH0.100.000.000.00
20HN1Kinemetrics FBA ES-T EpiSensor AccelerometerTG100.000.000.000.00
20HN2Kinemetrics FBA ES-T EpiSensor AccelerometerTG100.000.0090.000.00
20HNZKinemetrics FBA ES-T EpiSensor AccelerometerTG100.00-90.000.000.00
20LN1Kinemetrics FBA ES-T EpiSensor AccelerometerCG1.000.000.000.00
20LN2Kinemetrics FBA ES-T EpiSensor AccelerometerCG1.000.0090.000.00
20LNZKinemetrics FBA ES-T EpiSensor AccelerometerCG1.00-90.000.000.00
PDF, All
Image Unavailable

PDF, Last Month
Image Unavailable

PDF, Month
Image Unavailable

PDF, Current Week
Image Unavailable

PDF, Year
Image Unavailable

Heliplot
Image Unavailable
Latency
Image Unavailable

Availability, Last 365 Days
Image Unavailable

Availablity, Yearly
Image Unavailable

Availability, Last 30 Days
Image Unavailable
  1. 2013-07-29
    Batteries replaced.