Seismic Network Operations

IU RAO

Raoul, Kermadec Islands

IU RAO commences operations on: 2004,200

Country Flag
Host: Institute of Geological and Nuclear Sciences
Latitude: -29.245
Longitude: -177.929
Elevation: 60
Datalogger: Q330
Broadband: STS-1V/VBB
Accelerometer: FBA-23
Telemetry Status at the NEIC: Last Data In Less Than 10 Minutes
Station Photo Station Photo Station Photo Station Photo 

Site Description: Station is located on a 100m bluff on the small volcanic island.

Vault Condition: STS-2, STS-1 vertical and FBA-23 are located in a very shallow concrete vault.

Location CodeChannel CodeInstrumentFlagsSample RateDipAzimuthDepth
10BH1Trillium 240 broad bandCG40.000.000.000.50
00BH1Streckeisen STS-2.5CG40.000.000.000.50
10BH2Trillium 240 broad bandCG40.000.0090.000.50
00BH2Streckeisen STS-2.5CG40.000.0090.000.50
10BHZTrillium 240 broad bandCG40.00-90.000.000.50
00BHZStreckeisen STS-2.5CG40.00-90.000.000.50
00HH1Streckeisen STS-2.5TG100.000.000.000.50
00HH2Streckeisen STS-2.5TG100.000.0090.000.50
00HHZStreckeisen STS-2.5TG100.00-90.000.000.50
20HN1Kinemetrics FBA ES-T EpiSensor AccelerometerTG100.000.000.000.50
20HN2Kinemetrics FBA ES-T EpiSensor AccelerometerTG100.000.0090.000.50
20HNZKinemetrics FBA ES-T EpiSensor AccelerometerTG100.00-90.000.000.50
31LDOCI/PAS pressure sensorCW1.000.000.000.50
30LDOlower quality chip sensor in Setra boxCW1.000.000.000.50
10LH1Trillium 240 broad bandCG1.000.000.000.50
00LH1Streckeisen STS-2.5CG1.000.000.000.50
00LH2Streckeisen STS-2.5CG1.000.0090.000.50
10LH2Trillium 240 broad bandCG1.000.0090.000.50
10LHZTrillium 240 broad bandCG1.00-90.000.000.50
00LHZStreckeisen STS-2.5CG1.00-90.000.000.50
20LN1Kinemetrics FBA ES-T EpiSensor AccelerometerCG1.000.000.000.50
20LN2Kinemetrics FBA ES-T EpiSensor AccelerometerCG1.000.0090.000.50
20LNZKinemetrics FBA ES-T EpiSensor AccelerometerCG1.00-90.000.000.50
10VH1Trillium 240 broad bandCG0.100.000.000.50
00VH1Streckeisen STS-2.5CG0.100.000.000.50
10VH2Trillium 240 broad bandCG0.100.0090.000.50
00VH2Streckeisen STS-2.5CG0.100.0090.000.50
10VHZTrillium 240 broad bandCG0.10-90.000.000.50
00VHZStreckeisen STS-2.5CG0.10-90.000.000.50
10VMUTrillium 240 broad bandCH0.100.000.000.50
00VMUStreckeisen STS-2.5CG0.100.000.000.50
10VMVTrillium 240 broad bandCH0.100.000.000.50
00VMVStreckeisen STS-2.5CG0.100.000.000.50
10VMWTrillium 240 broad bandCH0.100.000.000.50
00VMWStreckeisen STS-2.5CG0.100.000.000.50
PDF, All
Image Unavailable

PDF, Last Month
Image Unavailable

PDF, Month
Image Unavailable

PDF, Current Week
Image Unavailable

PDF, Year
Image Unavailable

Heliplot
Image Unavailable
Latency
Image Unavailable

Availability, Last 365 Days
Image Unavailable

Availablity, Yearly
Image Unavailable

Availability, Last 30 Days
Image Unavailable
  1. 2013-05-17
    Upgraded to Q330 with STS-2 as primary and Trillium 240 as secondary. The STS-1 Z channel had not functioned since August 2009.