IU PTGA

Pitinga, Brazil

IU PTGA commences operations on: 1995,319

Country Flag
Host: University of Brasilia
Latitude: -0.731
Longitude: -59.967
Elevation: 237
Datalogger: Q330
Broadband: KS-54000
Accelerometer: FBA_ES-T_EpiSensor_Accelerometer
Telemetry Status at the NEIC: No Data In More Than 24 Hours
Station Photo Station Photo Station Photo 

Vault Condition: The surface vault is a concrete floored room. The pier rests on the floor.

Site Geology: Borehole drilled into a granitic intrusion.

Location CodeChannel CodeInstrumentFlagsSample RateDipAzimuthDepth
20LNZKinemetrics FBA ES-T EpiSensor AccelerometerCG1.00-90.000.000.00
20LN2Kinemetrics FBA ES-T EpiSensor AccelerometerCG1.000.0090.000.00
20LN1Kinemetrics FBA ES-T EpiSensor AccelerometerCG1.000.000.000.00
00VHZStreckeisen STS-2 High-gainCG0.10-90.000.000.00
00VH2Streckeisen STS-2 High-gainCG0.100.0092.000.00
00VH1Streckeisen STS-2 High-gainCG0.100.002.000.00
00LHZStreckeisen STS-2 High-gainCG1.00-90.000.000.00
00LH2Streckeisen STS-2 High-gainCG1.000.0092.000.00
00LH1Streckeisen STS-2 High-gainCG1.000.002.000.00
00BHZStreckeisen STS-2 High-gainCG40.00-90.000.000.00
00BH2Streckeisen STS-2 High-gainCG40.000.0092.000.00
00BH1Streckeisen STS-2 High-gainCG40.000.002.000.00
20HNZKinemetrics FBA ES-T EpiSensor AccelerometerTG100.00-90.000.000.00
20HN2Kinemetrics FBA ES-T EpiSensor AccelerometerTG100.000.0090.000.00
20HN1Kinemetrics FBA ES-T EpiSensor AccelerometerTG100.000.000.000.00
00HHZStreckeisen STS-2 High-gainTG100.00-90.000.000.00
00HH2Streckeisen STS-2 High-gainTG100.000.0092.000.00
00HH1Streckeisen STS-2 High-gainTG100.000.002.000.00
PDF, All
Image Unavailable

PDF, Last Month
Image Unavailable

PDF, Month
Image Unavailable

PDF, Current Week
Image Unavailable

PDF, Year
Image Unavailable

Heliplot
Image Unavailable
Latency
Image Unavailable

Availability, Last 365 Days
Image Unavailable

Availablity, Yearly
Image Unavailable

Availability, Last 30 Days
Image Unavailable
  1. Current Issues
    KS54000 is stuck in hole but providing some usable data (Z channel is inoperable). Need a return trip to blow the sand out and replace the seismometer. Station telemetry has been down since Nov 2015.
  2. 2009-11-06
    Upgraded to Q330 digitizer.