Seismic Network Operations

IU CASY

Casey, Antarctica

IU CASY commences operations on: 1996,050

Country Flag
Host: Geoscience Australia
Latitude: -66.279
Longitude: 110.535
Elevation: 10
Datalogger: Q330
Broadband: STS-1VBB_w/E300
Accelerometer: FBA_ES-T_EpiSensor_Accelerometer
Telemetry Status at the NEIC: Last Data In Less Than 10 Minutes
Station Photo Station Photo Station Photo Station Photo 

Vault Condition: The vault is a concrete structure in rock 6 meters below the surface. The pier is not isolated.

Location CodeChannel CodeInstrumentFlagsSample RateDipAzimuthDepth
20LN2FBA ES-T EpiSensor AccelerometerCG1.000.0090.005.00
20HN2FBA ES-T EpiSensor AccelerometerTG100.000.0090.005.00
10VH2STS-2 Standard-gainCG0.100.0090.005.00
10LH2STS-2 Standard-gainCG1.000.0090.005.00
10HH2STS-2 Standard-gainTG100.000.0090.005.00
10BH2STS-2 Standard-gainCG40.000.0090.005.00
00VH2STS-1VBB w/E300CG0.100.0090.005.00
00LH2STS-1VBB w/E300CG1.000.0090.005.00
00BH2STS-1VBB w/E300CG20.000.0090.005.00
30LDOCI/PAS pressure sensorCW1.000.000.005.00
20LNZFBA ES-T EpiSensor AccelerometerCG1.00-90.000.005.00
20LN1FBA ES-T EpiSensor AccelerometerCG1.000.000.005.00
20HNZFBA ES-T EpiSensor AccelerometerTG100.00-90.000.005.00
20HN1FBA ES-T EpiSensor AccelerometerTG100.000.000.005.00
10VMWSTS-2/VBBCH0.100.000.005.00
10VMVSTS-2/VBBCH0.100.000.005.00
10VMUSTS-2/VBBCH0.100.000.005.00
10VHZSTS-2 Standard-gainCG0.10-90.000.005.00
10VH1STS-2 Standard-gainCG0.100.000.005.00
10LHZSTS-2 Standard-gainCG1.00-90.000.005.00
10LH1STS-2 Standard-gainCG1.000.000.005.00
10HHZSTS-2 Standard-gainTG100.00-90.000.005.00
10HH1STS-2 Standard-gainTG100.000.000.005.00
10BHZSTS-2 Standard-gainCG40.00-90.000.005.00
10BH1STS-2 Standard-gainCG40.000.000.005.00
00VMZSTS-1VBB w/E300CH0.100.000.005.00
00VM2STS-1VBB w/E300CH0.100.000.005.00
00VM1STS-1VBB w/E300CH0.100.000.005.00
00VHZSTS-1VBB w/E300CG0.10-90.000.005.00
00VH1STS-1VBB w/E300CG0.100.000.005.00
00LHZSTS-1VBB w/E300CG1.00-90.000.005.00
00LH1STS-1VBB w/E300CG1.000.000.005.00
00BHZSTS-1VBB w/E300CG20.00-90.000.005.00
00BH1STS-1VBB w/E300CG20.000.000.005.00
PDF, All
Image Unavailable

PDF, Last Month
Image Unavailable

PDF, Last Year
Image Unavailable

PDF, Month
Image Unavailable

PDF, Current Week
Image Unavailable

PDF, Year
Image Unavailable

Heliplot
Image Unavailable
Latency
Image Unavailable

Availability, Year
Image Unavailable

Availability, Since 1972
Image Unavailable

Availability, 2 Month
Image Unavailable
  1. Current Issues
    The LNZ component is noisy.
  2. 2012-01-31
    Power restored and station upgraded to Q330 digitizer. STS-1 components rebuilt fixing persistent lowered response at long periods which had been present since a major flood in 1998.
  3. 2012-01-03
    The power cable to the station was severed.