Seismic Network Operations
IU BILL
Bilibino, Russia
IU BILL commences operations on: 1995,228
| Host: | Geophysical Survey, Russian Academy of Sciences |
|---|---|
| Latitude: | 68.065 |
| Longitude: | 166.453 |
| Elevation: | 320 |
| Datalogger: | Q680 |
| Broadband: | STS-1V/VBB |
| Accelerometer: | ? |
| Telemetry Status at the NEIC: |
|
Vault Condition: The vault lies below an apartment complex. The concrete pier is isolated from the floor.
Site Geology: Bilibino lies within the Anju fold region of the Chukotsk fold system. The Anjo fold region consists of ingneous rock such as gabbors-diabase and sedimentary rock including aleurite, argillite, crystal shale and various types of limestones.
| Location Code | Channel Code | Instrument | Flags | Sample Rate | Dip | Azimuth | Depth |
|---|---|---|---|---|---|---|---|
| 10 | SHZ | GS-13 | CG | 40.00 | -90.00 | 0.00 | 0.00 |
| 10 | EHZ | GS-13 | TG | 80.00 | -90.00 | 0.00 | 0.00 |
| 00 | VK1 | Quanterra DA temperature monitor | TG | 0.10 | 0.00 | 0.00 | 0.00 |
| 00 | VHZ | STS-1V/VBB | CG | 0.10 | -90.00 | 0.00 | 0.00 |
| 00 | VHN | STS-1H/VBB | CG | 0.10 | 0.00 | 0.00 | 0.00 |
| 00 | LHZ | STS-1V/VBB | CG | 1.00 | -90.00 | 0.00 | 0.00 |
| 00 | LHN | STS-1H/VBB | CG | 1.00 | 0.00 | 0.00 | 0.00 |
| 00 | BHZ | STS-1V/VBB | CG | 20.00 | -90.00 | 0.00 | 0.00 |
| 00 | BHN | STS-1H/VBB | CG | 20.00 | 0.00 | 0.00 | 0.00 |
| 00 | VHE | STS-1H/VBB | CG | 0.10 | 0.00 | 90.00 | 0.00 |
| 00 | LHE | STS-1H/VBB | CG | 1.00 | 0.00 | 90.00 | 0.00 |
| 00 | BHE | STS-1H/VBB | CG | 20.00 | 0.00 | 90.00 | 0.00 |
| 10 | SHN | GS-13 | CG | 40.00 | 0.00 | 180.00 | 0.00 |
| 10 | EHN | GS-13 | TG | 80.00 | 0.00 | 180.00 | 0.00 |
| 10 | SHE | GS-13 | CG | 40.00 | 0.00 | 270.00 | 0.00 |
| 10 | EHE | GS-13 | TG | 80.00 | 0.00 | 270.00 | 0.00 |
PDF, All

PDF, Last Month

PDF, Last Year

PDF, Month

PDF, Current Week

PDF, Year


PDF, Last Month

PDF, Last Year

PDF, Month

PDF, Current Week

PDF, Year

Heliplot


Latency


Availability, Year

Availability, Since 1972

Availability, 2 Month


Availability, Since 1972

Availability, 2 Month

-
Current IssuesData flow was stopped from Sept. 2011 to mid-April 2012 due to non-technical reasons. Data flow resumed in April but stopped again in early July due to a broken network link. Data flow has resumed but data is noisy.

