Seismic Network Operations
IC ENH
Enshi, Hubei Province, China
IC ENH commences operations on: 1997,263
| Host: | Institute of Geophysics and China Earthquake Administration |
|---|---|
| Latitude: | 30.276 |
| Longitude: | 109.494 |
| Elevation: | 500 |
| Datalogger: | Q680 |
| Broadband: | STS-1V/VBB |
| Accelerometer: | FBA-23 |
| Telemetry Status at the NEIC: |
|
| Location Code | Channel Code | Instrument | Flags | Sample Rate | Dip | Azimuth | Depth |
|---|---|---|---|---|---|---|---|
| 20 | LNZ | FBA-23 | CG | 1.00 | 90.00 | 0.00 | 0.00 |
| 20 | LNN | FBA-23 | CG | 1.00 | 0.00 | 180.00 | 0.00 |
| 20 | LNE | FBA-23 | CG | 1.00 | 0.00 | 270.00 | 0.00 |
| 20 | HNZ | FBA-23 | TG | 80.00 | 90.00 | 0.00 | 0.00 |
| 20 | HNN | FBA-23 | TG | 80.00 | 0.00 | 180.00 | 0.00 |
| 20 | HNE | FBA-23 | TG | 80.00 | 0.00 | 270.00 | 0.00 |
| 10 | HHE | STS-2/VBB | TG | 80.00 | 0.00 | 90.00 | 0.00 |
| 10 | BHZ | STS-2/VBB | CG | 40.00 | -90.00 | 0.00 | 0.00 |
| 10 | LHZ | STS-2/VBB | CG | 1.00 | -90.00 | 0.00 | 0.00 |
| 10 | LHN | STS-2/VBB | CG | 1.00 | 0.00 | 0.00 | 0.00 |
| 10 | LHE | STS-2/VBB | CG | 1.00 | 0.00 | 90.00 | 0.00 |
| 10 | HHZ | STS-2/VBB | TG | 80.00 | -90.00 | 0.00 | 0.00 |
| 10 | HHN | STS-2/VBB | TG | 80.00 | 0.00 | 0.00 | 0.00 |
| 10 | BHN | STS-2/VBB | CG | 40.00 | 0.00 | 0.00 | 0.00 |
| 10 | BHE | STS-2/VBB | CG | 40.00 | 0.00 | 90.00 | 0.00 |
| 00 | VHZ | STS-1V/VBB | CG | 0.10 | -90.00 | 0.00 | 0.00 |
| 00 | VHN | STS-1H/VBB | CG | 0.10 | 0.00 | 0.00 | 0.00 |
| 00 | VHE | STS-1H/VBB | CG | 0.10 | 0.00 | 90.00 | 0.00 |
| 00 | LHZ | STS-1V/VBB | CG | 1.00 | -90.00 | 0.00 | 0.00 |
| 00 | LHN | STS-1H/VBB | CG | 1.00 | 0.00 | 0.00 | 0.00 |
| 00 | LHE | STS-1H/VBB | CG | 1.00 | 0.00 | 90.00 | 0.00 |
| 00 | BHZ | STS-1V/VBB | CG | 20.00 | -90.00 | 0.00 | 0.00 |
| 00 | BHN | STS-1H/VBB | CG | 20.00 | 0.00 | 0.00 | 0.00 |
| 00 | BHE | STS-1H/VBB | CG | 20.00 | 0.00 | 90.00 | 0.00 |
PDF, All

PDF, Last Month

PDF, Last Year

PDF, Month

PDF, Current Week

PDF, Year


PDF, Last Month

PDF, Last Year

PDF, Month

PDF, Current Week

PDF, Year

Heliplot


Latency


Availability, Year

Availability, Since 1972

Availability, 2 Month


Availability, Since 1972

Availability, 2 Month

-
2013-05-02Upgraded to Q330. Added STS-2.5 as a secondary sensor.
-
2011-03-03STS-2 replaced.




