Seismic Network Operations

CU BCIP

Isla Barro Colorado, Panama

CU BCIP commences operations on: 2006,336

Country Flag
Host: Smithsonian Tropical Research Institute
Latitude: 9.166
Longitude: -79.837
Elevation: 61
Datalogger: Q330
Broadband: STS-2
Accelerometer: FBA
Telemetry Status at the NEIC: Last Data In Less Than 10 Minutes
Station Photo Station Photo Station Photo 
Location CodeChannel CodeInstrumentFlagsSample RateDipAzimuthDepth
00VMWStreckeisen STS-2 Standard-gainCH0.100.000.000.00
00VMVStreckeisen STS-2 Standard-gainCH0.100.000.000.00
00VMUStreckeisen STS-2 Standard-gainCH0.100.000.000.00
20LNZKinemetrics FBA ES-T EpiSensor AccelerometerCG1.00-90.000.000.00
20LN2Kinemetrics FBA ES-T EpiSensor AccelerometerCG1.000.0090.000.00
20LN1Kinemetrics FBA ES-T EpiSensor AccelerometerCG1.000.000.000.00
00LHZStreckeisen STS-2 Standard-gainCG1.00-90.000.000.00
00LH2Streckeisen STS-2 Standard-gainCG1.000.0090.000.00
00LH1Streckeisen STS-2 Standard-gainCG1.000.000.000.00
20HNZKinemetrics FBA ES-T EpiSensor AccelerometerTG100.00-90.000.000.00
20HN2Kinemetrics FBA ES-T EpiSensor AccelerometerTG100.000.0090.000.00
20HN1Kinemetrics FBA ES-T EpiSensor AccelerometerTG100.000.000.000.00
00BHZStreckeisen STS-2 Standard-gainCG40.00-90.000.000.00
00BH2Streckeisen STS-2 Standard-gainCG40.000.0090.000.00
00BH1Streckeisen STS-2 Standard-gainCG40.000.000.000.00
PDF, All
Image Unavailable

PDF, Last Month
Image Unavailable

PDF, Month
Image Unavailable

PDF, Current Week
Image Unavailable

PDF, Year
Image Unavailable

Heliplot
Image Unavailable
Latency
Image Unavailable

Availability, Last 365 Days
Image Unavailable

Availablity, Yearly
Image Unavailable

Availability, Last 30 Days
Image Unavailable
  1. 2013-06-08
    Batteries replaced.