identifier

SHIPS Home | Contents > Overview > Wet SHIPS > Photos

March 24, 1998. In preparation for removal of the equipment and shipment back to Redwood City, we rotate a truck trailor on the dock so that it is facing home. trailer
March 24, 1998. On the ship at the end of seismic operations it is time to winch in the streamer. Kevin O'Toole (Supervisor of Marine Technicians at the USGS Marine Facility) operates the winch. winch operations
March 24, 1998. Dave Hogg (Supervisor of Electronics Technicians at the USGS Marine Facility) guides the streamer onto the winch reel. winch operations

USGS Privacy Statement || Disclaimer  || Accessibility
Department of the Interior   U.S. Geological Survey  

http://earthquake.usgs.gov/regional/pacnw/ships/wetships/photos4.html
maintained by Susan Rhea
last modified Wed, Feb 28, 2001