Seismic Network Operations
IU PTCN
Pitcairn Island, South Pacific
IU PTCN commences operations on: 1996,364
| Host: | British Geological Survey |
|---|---|
| Latitude: | -25.071 |
| Longitude: | -130.095 |
| Elevation: | 220 |
| Datalogger: | Q680 |
| Broadband: | STS-2/VBB |
| Accelerometer: | FBA-23 |
| Telemetry Status at the NEIC: |
|
Vault Condition: concrete pier
Site Geology: Vault sits on top of a scoria base and is surrounded by fill.
| Location Code | Channel Code | Instrument | Flags | Sample Rate | Dip | Azimuth | Depth |
|---|---|---|---|---|---|---|---|
| 00 | VK1 | Quanterra DA temperature monitor | CG | 0.10 | 0.00 | 0.00 | 2.00 |
| 00 | VHZ | STS-2/VBB | CG | 0.10 | -90.00 | 0.00 | 2.00 |
| 00 | VHN | STS-2/VBB | CG | 0.10 | 0.00 | 0.00 | 2.00 |
| 00 | VHE | STS-2/VBB | CG | 0.10 | 0.00 | 90.00 | 2.00 |
| 00 | VE1 | Quanterra DA voltage monitor | CG | 0.10 | 0.00 | 0.00 | 2.00 |
| 10 | LNZ | FBA-23 | CG | 1.00 | -90.00 | 0.00 | 2.00 |
| 10 | LNN | FBA-23 | CG | 1.00 | 0.00 | 0.00 | 2.00 |
| 10 | LNE | FBA-23 | CG | 1.00 | 0.00 | 90.00 | 2.00 |
| 00 | LHZ | STS-2/VBB | CG | 1.00 | -90.00 | 0.00 | 2.00 |
| 00 | LHN | STS-2/VBB | CG | 1.00 | 0.00 | 0.00 | 2.00 |
| 00 | LHE | STS-2/VBB | CG | 1.00 | 0.00 | 90.00 | 2.00 |
| 00 | BHZ | STS-2/VBB | CG | 20.00 | -90.00 | 0.00 | 2.00 |
| 00 | BHN | STS-2/VBB | CG | 20.00 | 0.00 | 0.00 | 2.00 |
| 00 | BHE | STS-2/VBB | CG | 20.00 | 0.00 | 90.00 | 2.00 |
| 01 | BHZ | STS-2/VBB | CG | 40.00 | -90.00 | 0.00 | 2.00 |
| 01 | BHN | STS-2/VBB | CG | 40.00 | 0.00 | 0.00 | 2.00 |
| 01 | BHE | STS-2/VBB | CG | 40.00 | 0.00 | 90.00 | 2.00 |
| BC0 | STS-2/VBB | TG | 40.00 | 0.00 | 0.00 | 2.00 | |
| 10 | HNZ | FBA-23 | TG | 80.00 | -90.00 | 0.00 | 2.00 |
| 10 | HNN | FBA-23 | TG | 80.00 | 0.00 | 0.00 | 2.00 |
| 10 | HNE | FBA-23 | TG | 80.00 | 0.00 | 90.00 | 2.00 |
| 00 | HHZ | STS-2/VBB | TG | 80.00 | -90.00 | 0.00 | 2.00 |
| 00 | HHN | STS-2/VBB | TG | 80.00 | 0.00 | 0.00 | 2.00 |
| 00 | HHE | STS-2/VBB | TG | 80.00 | 0.00 | 90.00 | 2.00 |
PDF, All

PDF, Last Month

PDF, Last Year

PDF, Month

PDF, Current Week

PDF, Year


PDF, Last Month

PDF, Last Year

PDF, Month

PDF, Current Week

PDF, Year

Heliplot


Latency


Availability, Year

Availability, Since 1972

Availability, 2 Month


Availability, Since 1972

Availability, 2 Month

-
2012-08-25The STS-2 host box was replaced. It had failed in late April.

