Seismic Network Operations
IC HIA
Hailar, Neimenggu Autonomous Region, China
IC HIA commences operations on: 1994,338
| Host: | Institute of Geophysics and China Earthquake Administration |
|---|---|
| Latitude: | 49.27 |
| Longitude: | 119.741 |
| Elevation: | 620 |
| Datalogger: | Q680 |
| Broadband: | STS-1V/VBB |
| Accelerometer: | FBA-23 |
| Telemetry Status at the NEIC: |
|
Vault Condition: Seismometers are located in a tunnel on concrete piers isolated from the floor and attached to bedrock (andesite). Vault temperature is stable but a dehumidifier is required. The tunnel extends from the main building into the adjacent hillside.
Site Geology: Andesite
| Location Code | Channel Code | Instrument | Flags | Sample Rate | Dip | Azimuth | Depth |
|---|---|---|---|---|---|---|---|
| 00 | BHE | STS-1H/VBB | CG | 20.00 | 0.00 | 90.00 | 0.00 |
| 00 | BHN | STS-1H/VBB | CG | 20.00 | 0.00 | 0.00 | 0.00 |
| 00 | BHZ | STS-1V/VBB | CG | 20.00 | -90.00 | 0.00 | 0.00 |
| 10 | EHE | GS-13 | TG | 80.00 | 0.00 | 90.00 | 0.00 |
| 10 | EHN | GS-13 | TG | 80.00 | 0.00 | 0.00 | 0.00 |
| 10 | EHZ | GS-13 | TG | 80.00 | -90.00 | 0.00 | 0.00 |
| 20 | HNE | FBA-23 | TG | 80.00 | 0.00 | 270.00 | 35.00 |
| 20 | HNN | FBA-23 | TG | 80.00 | 0.00 | 180.00 | 35.00 |
| 20 | HNZ | FBA-23 | TG | 80.00 | 90.00 | 0.00 | 35.00 |
| 00 | LHE | STS-1H/VBB | CG | 1.00 | 0.00 | 90.00 | 0.00 |
| 00 | LHN | STS-1H/VBB | CG | 1.00 | 0.00 | 0.00 | 0.00 |
| 00 | LHZ | STS-1V/VBB | CG | 1.00 | -90.00 | 0.00 | 0.00 |
| 20 | LNE | FBA-23 | CG | 1.00 | 0.00 | 270.00 | 0.00 |
| 20 | LNN | FBA-23 | CG | 1.00 | 0.00 | 180.00 | 0.00 |
| 20 | LNZ | FBA-23 | CG | 1.00 | 90.00 | 0.00 | 0.00 |
| 10 | SHE | GS-13 | CG | 40.00 | 0.00 | 90.00 | 0.00 |
| 10 | SHN | GS-13 | CG | 40.00 | 0.00 | 0.00 | 0.00 |
| 10 | SHZ | GS-13 | CG | 40.00 | -90.00 | 0.00 | 0.00 |
| 00 | VHE | STS-1H/VBB | CG | 0.10 | 0.00 | 90.00 | 0.00 |
| 00 | VHN | STS-1H/VBB | CG | 0.10 | 0.00 | 0.00 | 0.00 |
| 00 | VHZ | STS-1V/VBB | CG | 0.10 | -90.00 | 0.00 | 0.00 |
PDF, All

PDF, Last Month

PDF, Last Year

PDF, Month

PDF, Current Week

PDF, Year


PDF, Last Month

PDF, Last Year

PDF, Month

PDF, Current Week

PDF, Year

Heliplot


Latency


Availability, Year

Availability, Since 1972

Availability, 2 Month


Availability, Since 1972

Availability, 2 Month

-
2013-05-10Upgraded to Q330 digitizer with STS-2.5 as secondary sensor. Previously had lowered response on the STS-1 vertical component.

