Global CMT Project Moment Tensor Solution
July 14, 2010, BIO-BIO, CHILE, MW=6.6
Goran Ekstrom
CENTROID-MOMENT-TENSOR SOLUTION
GCMT EVENT: C201007140832A
DATA: IU CU II GE G IC
L.P.BODY WAVES:109S, 247C, T= 50
MANTLE WAVES: 103S, 176C, T=125
SURFACE WAVES: 109S, 254C, T= 50
TIMESTAMP: Q-20100714153243
CENTROID LOCATION:
ORIGIN TIME: 08:32:27.9 0.1
LAT:38.32S 0.00;LON: 73.93W 0.01
DEP: 17.3 0.3;TRIANG HDUR: 4.7
MOMENT TENSOR: SCALE 10**25 D-CM
RR= 3.260 0.025; TT= 0.136 0.017
PP=-3.390 0.023; RT= 0.020 0.056
RP=-8.330 0.172; TP=-0.115 0.016
PRINCIPAL AXES:
1.(T) VAL= 8.905;PLG=56;AZM= 89
2.(N) 0.136; 1; 180
3.(P) -9.035; 34; 271
BEST DBLE.COUPLE:M0= 8.97*10**25
NP1: STRIKE= 4;DIP=11;SLIP= 94
NP2: STRIKE=180;DIP=79;SLIP= 89
-----#####-
---------########--
----------###########--
------------#############--
-------------##############--
--------------###############--
-------------#################-
---- -------######## ######--
---- P -------######## T ######--
---- -------######## ######--
--------------#################--
-------------#################-
--------------###############--
-------------##############--
------------#############--
----------###########--
---------########--
-----####--
Global CMT Project Catalog Search